Sign In | Join Free | My wpc-board.com
China Jinzhou City Shitan Machinery Equipment CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump
Verified Supplier

8 Years

Home > Water Well Drilling Rig >

260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized

  • 1
  • 2

Brand Name : SHITAN

Model Number : ST 260

Certification : ISO

Place of Origin : China

MOQ : 1 Set

Price : 25000-30000 USD

Payment Terms : T/T, Western Union

Supply Ability : 1000/month

Delivery Time : 5-8days

Packaging Details : Wooden case (bare)

Product Name : ST 260 Water Well Drilling Rig

Drilling diameter : 105-260mm

After-sales service provided : video support

Warranty : 1 Year

Power type : Diesel

Color : Yellow

Weight : 6T

Rotary Head Storke : 3.4m-6.0m

Rated Power : 55-132KW

Optional accessories : 70KW

Weight of the rig : 4m×1.7m×2.2m

Air pressure : 16-55m³/min

Contact Now

St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig Machine

ST 260 Water Well Drilling Rig Description

It can work on different formations, well drilling diameter up to 245mm. This is mainly applied in drilling wells, irrigation wells, geothermal wells and air holes for other purposes, especially for mountain and rock formation water engineering.Drilling Depth is 260 meters and use Yuchai diesel engine.

Tech Details

Hole Diameter φ105-260mm
Drilling Depth 260 meters
Working pressure 1.7-3.0MPa
Air consumption 17-35m³/min
Length of rod 1.5m,2m,3m,6m
Dia. Of rod φ76, φ89,φ102,φ114
Lifting power 24T
Rotation torque 8500-11000N.m
Rotation Speed 40-70r/min
Diesel Engine Yuchai
Engine Power 85Kw/2200rpm
Travelling speed 0-2.5 Km/h
Climb capacity 30°
Weight 9000kgs
Dimension 5900x2000x2850mm
Application Complicated geological conditions:Rock,Mud,Sand etc.
Drilling Way Top drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer 4",5",6",8" Drill hammer or CIR110, 130, 150,170

ST 260 Water Well Drilling Rig Features

1. Equipped with 75KW Yiqi brand turbocharged engine, strong power;
2. Patented design composite boom, double cylinder lift, long stroke, large tonnage
3. The main boom of each rig is equipped with a stopper to protect the cylinder;
4.Drilling machine chassis: professional excavator chassis ,durable,heavy bearing capacity,wide chain plate, less damage to hard road.
5.Parallel gearbox design, separate oil pump, sufficient power supply, reasonable distribution, unique design of hydraulic system,simple maintenance and low cost
6. The travel motor is equipped with reducer, durable and long service life;
7. Dust-reducing device: effectively reduce dust pollution, for potholes, tunnel construction.
8. Fast distribution valve: the speed of three gears up to 150-160 rpm, basically achieve the dual-use function of water and air
9. Each hydraulic hose is covered with soft management set to make the hose last longer.
10. The rig power is driven by the diesel engine, and the rig's walking, turning, propulsion, lifting, outriggers, and unloading
rods are all controlled by hydraulic pressure.

ST 260 Water Well Drilling Rig Application

The water welll drilling rigs are available in various models and sizes. These rigs are offered in various technical specifications as per the client’s specific need.is mainly applicable to industrial and civil drilling, geothermal drilling, has the advantages of compact structure, fast advancing, mobile and flexible wide application region etc.. Pneumatic well drill is especially suitable for water intake in

Precautions when working at low temperature

1. In the low temperature environment, the land will become hard, so when we choose the site, we need to have some requirements. The site needs to be flat and the road needs to be unblocked. This must be ensured.

2. The drilling machine mainly uses triangular support, especially in the case of low temperature, we should ensure that the support of the drilling machine is firm and reliable. Our staff need to regularly check and deal with hidden dangers in time once they are found. We must not be careless

3. Although we work at low temperature, we can not ignore the problem of fire prevention. The configuration of fire-fighting equipment must be reasonable and meet the fire-fighting requirements.

4. Low temperature, low temperature, what is the most important? Of course, our friends should pay attention to their warmth when working. Only when they are warm can we better put ourselves into work.

5. The temperature is low, which will definitely have certain impact on the construction. We must pay attention to warmth and safety

What aspects should we pay attention to in the drilling process of water well drilling rig?

Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.

260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized

260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized
260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized

Product Tags:

Diesel Engine Borehole Drilling Machine

      

260M Water Well Borehole Drilling Rig

      

Customized Borehole Drilling Machine

      
Wholesale 260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized from china suppliers

260 Meters Water Well Borehole Drilling Rig Diesel Engine Customized Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)