Sign In | Join Free | My wpc-board.com |
|
Brand Name : JINZHOU SHITAN
Model Number : ST-350
Certification : ISO
Place of Origin : China
MOQ : 1 set
Price : Negotiation
Payment Terms : T/T, Western Union
Supply Ability : 20000 sets per year
Delivery Time : 7-10 days
Packaging Details : Standard Export Package
Product Name : Water Well Drilling Rig
Model : ST 350 Crawler Mounted
Machine Type : Drilling Equipment
Hole Diameter : Customized
Drilling Depths : 350meters
Condition : New
Weight : 8.9 T
Warranty : 12 months
Rotation torque : 7500Nm, 983 N.m, 4200N.m, 3400mm
Air consumption : 16-30 M3/min, 20-100m3/min, 17-31m3/min, 16-30cubic meter/min
After sale service : Video Support
ST-350 Pneumatic Drilling Rig High Speed Groundwater Resource Water Well Drilling Rig
ST 350 Water Well Drilling Rig Introduction:
It is suitable for industrial and civil drilling and geothermal drilling. It has the advantages of large drilling diameter, deep drilling, fast footage, flexible movement and so on
ST 350 Water Well Drilling Rig Technical Data:
Product Name | ST 350 |
Power Type | Diesel |
Place of Origin | China |
Brand Name | SHITAN |
Usage | Water Well Drilling Rigs |
Dimension(L*W*H) | 6400MM*2250MM*2700MM |
Weight Of Machine | 8.9 T |
Certification | ISO9000 |
Warranty Time | 12 Months |
Color | Blue,red ,yellow |
Drilling diameter | 152mm-305mm |
Depth | 25M |
Rotary speed | 0-90rpm |
DTH | K40 |
Drilling Rods | 76*2m+76*3m |
Air consumption | 13-20m3/min |
Travelling speed | 0-2.5km/h |
ST 350 Water Well Drilling Rig Main Advantage:
Water Well Drilling Rig Working Process:
1. It is necessary to measure the distance during drilling. Generally, drill 10m each time or replace the drill bit, measure the drill pipe once, check the drilling depth, and modify it if necessary. Check whether the gearbox, bushing and vertical shaft gear are overheated and whether there is abnormal sound. If any problem is found, stop in time, find the cause and stop solving the problem.
2. When excavating with clean water, do not supply water before excavation. In addition, water can only be drilled after return. And make sure you have enough traffic. The rock powder in the hole takes a long time. Increase the water volume to prolong the service time of the pump, and wait until before drilling.
3. When replacing drilling tools, Changsha drilling platform is generally required to measure every 10m to change the drilling depth. Even if the gearbox, bushing, vertical shaft gear and other overheating phenomena occur, there will be no abnormal sound. If there is any problem, please stop immediately, investigate the cause and deal with it within a time.
![]() |
St-350 Pneumatic Portable Borehole Drilling Machine High Speed Groundwater Resource Images |